Saturday July 22 at 11:37, there was a power outage in the Huygens building, also for all equipment connected to emergency power. The power outage lasted long enough to leave even devices and rooms with a UPS battery backup without power. This included all network equipment (routers, switches, wireless access points) and all servers in the C&CZ large server room.
When power returned from 14:08, several devices were defective:
- Half of the fully redundant FNWI router was defective. External companies in the UBC are not doubly connected to their provider, so they had no connectivity until Monday, when their connectivity was switched. Since Monday afternoon, the FNWI router has been repaired, so is redundant again.
...