1072: U: / home server pile and Linux login server lilo/stitch problems
The server had a high load and stopped servicing users, probably because of problems with the creation of new snapshots at 13:00 hours. A reboot solved the problem.
CPK messages are initially sent to the CPK mailing list, you can (un)subscribe via this link. You can also follow the service interruption messages via RSS using the link in the title under the RSS icon. If the CPK takes more time to resolve, any updates are published on this website.
For RU wide service interruption see meldingen.ru.nl.
The server had a high load and stopped servicing users, probably because of problems with the creation of new snapshots at 13:00 hours. A reboot solved the problem.
On Monday evening, February 3rd between 19:00 - 24:00 (7:00 - 12:00 pm) maintanance will be carried out on the network devices in Huygens Wing 5. Therefore the wired and wireless networks will not be available at some moments at all locations in this Wing, on all floors.
The announced proceedings on Tuesday, January 21st on the network equipment unfortunately did not take place due to a sudden instability of the network in Wing 1 the same day. In order to prevent further instability issues in Wing 2, it was necessary to solve the problems in Wing 1 first. These problems have been identified and corrected. The network maintenance in Wing 2 will now take place Tuesday, January 28th between 19:00 and 24:00 ( 7:00 pm to 12:00 ) during which the wireless and cabled networks will be off line for some time. This will affect all floors in Wing 2 and rooms along the corridors between wings 2 and 4 (all floors). ...
On Tuesday evening January 21 between 7:00 pm and 12:00 pm maintanance will be carried out on the network devices in Huygens wing 2. Therefore the wired and wireless networks will not be available at some moments at all locations in wing 2 and corridors between wings 2 and 4, on all floors.
On Monday evening January 13 between 7:00 pm and 12:00 pm maintanance will be carried out on the network devices in Huygens wing 1. Therefore the wired and wireless networks will not be available at some moments in many locations in wing 1 and corridors between wings 1 and 3, on all floors.
Due to an error by an ISC network administrator, all internal and external RU network traffic was blocked for a short period.
The replacement of the old home server “bundle” has been postponed and will now guaranteed take place on Monday morning December 23. Because the data have been synchronized with the new server, there will not be much downtime. The new server should be very dependable: hardware RAID-6, double processors and power supplies and a 5-year support contract from the supplier. The performance has improved, e.g. by using hardware RAID with a 1 GB write cache with battery backup. ...
In the course of these two days, above network shares will be moved to new servers. During the move action, a share will not be available. If you encounter any problems connecting to a network share using Windows, always connect using the “share-name minus srv” naming scheme: \\sharenaam-srv.science.ru.nl\sharenaam. See also Diskruimte#Naming. Affected network shares: acfiles2 botany botany-general carta comsol digicd encapson encapson2 exoarchief felix gi2 gi3 hfml-45t hfml-data hfml-engineering ifl iris mailmanincludes mbaudit1 mbaudit2 mbbioel mbcns mbcortex mbdata mbread mbwrite mestrelab mi2 mi3 milkun4 milkun4rw molchem molchem2 molphtec mol-secr multimedia neuropi ns3 nwi-backup onlyme owc pcb planthgl plantkunde-hgl sdisk/software share snn sofie spmdata1 tdisk/cursus tece teceleiding temp tracegastemp wallpaper xpcursus xpsoftware ...
Tuesday night December 17 19:00-24:00 hours, maintenance work will be done affecting the data network in Huygens wing 1. The wired and wireless network will suffer service interruptions a few times during that period. The main inconvenience will be on the ground floor.
C&CZ changed the DHCP-configuration of the KM MFP’s, because KM had told us all KM’s had an identical configuration after the upgrade of the night of December 4. Soon thereafter the KM’s outside of the Huygens building showed problems. After changing the DHCP-configuration back to the previous version and restarting the MFP’s, the problem was resolved. The firmware upgrade of these machines still has to take place.