CPK messages are initially sent to the CPK mailing list, you can (un)subscribe via this link. You can also follow the service interruption messages via RSS using the link in the title under the RSS icon. If the CPK takes more time to resolve, any updates are published on this website.

For RU wide service interruption see meldingen.ru.nl.

 

Service Interruptions


 No service interruptions.


Resolved Reports


1112: Network maintenance in part of Huygens

Because of a software upgrade of the network switches in the buildings/floors/locations mentioned above, these network switches will be rebooted at 06:00h (AM) exactly. This means that both wired en wireless networks at these locations will be interrupted for 10 to 15 minutes and network traffic will not be possible. This includes the network for access control, climate control etc. Locations: Huygens wing 3 all floors Huygens wing 4 all floors Huygens wing 8 all floors Huygens central street between wing 6 and 8 all floors

Updated Oct 11, 2022  ·  Bram Daams · Created Nov 6, 2014 · 

1111: Network maintenance in peripheral buildings

Because of a software upgrade of the network switches in the buildings/floors/locations mentioned above, these network switches will be rebooted on Tuesday morning at 06:00h (AM) exactly. This means that both wired en wireless networks at these locations will be interrupted for 10 to 15 minutes and network traffic will not be possible. This includes the network for access control, climate control etc. Locations: FELIX, HFML, Nanolab, Goudsmit pavillion (NMR), Lab DCN in A-2.002, Kinderopvang Heyendael (both buildings), Logistiek Centrum FNWI, Linnaeus building, Mercator 1, 6th floor ...

Updated Oct 11, 2022  ·  Bram Daams · Created Nov 4, 2014 · 

1110: Network maintenance in Huygens wing 7

Because of an upgrade of the network switches in the buildings/floors/locations mentioned above, these network switches will be replaced. This means that both wired en wireless networks at these locations will be interrupted and network traffic will not be possible. This includes the network for access control, climate control etc.

Updated Oct 11, 2022  ·  Bram Daams · Created Oct 29, 2014 · 

1109: RU network problem

Due to a short DDOS-attack the RU was virtually disconnected from the Internet during ca 7 minutes. All network connected systems may have had problems during that time. Until 15:30 some Eduroam users still had problems acquiring an IP address.

Updated Oct 11, 2022  ·  Bram Daams · Created Oct 29, 2014 · 

1108: FNWI network problem

The router that regulates all IP traffic between subnets in the Huygens building and surrounding buildings, became too busy. All network traffic, especially UDP had problems. ISC network admins reduced the load by simplifying the ACLs and reducing logging. At about 12:00 the problem was temporarily solved. C&CZ will do a further inspection of all ACLs, with the aim to reduce the load on the router without reducing security for connected systems.

Updated Oct 11, 2022  ·  Bram Daams · Created Oct 15, 2014 · 

1106: Disturbance of Vodafone VWO data traffic

On the ISC website we read: Radboud University agreed on a new mobile telephone contract with - again - provider Vodafone. For this purpose, on Wednesday, September 24th during daytime the Radboud subscriptions will be adjusted. Employees with a Vodafone mobile wille have no disturbance in calling or being called that day. But the Vodafone data network might be temporarily unavailable. To restore the data connection it is necessary to turn the mobile phone off and then on again. Of course employees on campus can always use the eduroam Wi-Fi network. ...

Updated Oct 11, 2022  ·  Bram Daams · Created Sep 24, 2014 · 

1107: DNS resolver problem

The server that acts within FNWI as first DNS resolver crashed. This made the network virtually unusable for a lot of computers in FNWI. Only after a reboot of the server, the problem was solved. Measures to reduce the inconvenience of such a crash and to make such a crash less likely, have been partly taken and are partly in preparation.

Updated Oct 11, 2022  ·  Bram Daams · Created Sep 20, 2014 · 

1105: Webserver (klopjacht) disk problem

A defective disk made the server stop serving web requests. A reboot fixed the problem. The defective disk will be replaced soon.

Updated Oct 11, 2022  ·  Bram Daams · Created Sep 9, 2014 · 

1104: Surfnet uplink offline

Due to an error during the planned maintenance by Surfnet of the RU network interface, the uplink of Radboud University to Surfnet was down.

Updated Oct 11, 2022  ·  Bram Daams · Created Sep 8, 2014 · 

1103: Fileserver goudsmit problems

One of the filesystems contained errors and prevented the system from starting up.

Updated Oct 11, 2022  ·  Bram Daams · Created Sep 8, 2014 ·